MetisEI
online · directing the plant
→ MATERIAL HANDLER · CELL 4
Dry the PA6-GF30 for Tool 214 now — it presses on Line 7 in 40 min. Pull from bay B, 4-hour dry cycle already met.
07:12 ✓✓
→ TEAM LEADER · LINE 7
Fixture F-12 downtime, 6 min and climbing. Standby fixture is in the problem box at station 3. Swap now, I've logged the fault.
07:14 ✓✓
→ QUALITY + LINE MANAGER · LINE 12
Right-first-time dropped below 96% on the J34A skin. Two scrap logged this hour. Quality to the line — I've opened a draft 8D.
07:15 ✓✓
→ STORES + PLANNER
WIP on clip-2148 hits minimum in 90 min. Works order raised, scheduled onto Machine 6, same tool, no changeover. No action unless you object.
07:16 ✓✓
One brain, routing every message.
Because MetisEI already knows the demand, the schedule, the skills matrix and the live state of every line, it knows who needs to hear what — and it just tells them. No radio calls, no chasing a supervisor, no problem sitting unseen until someone walks past.
Material handlers → dry the right material before the tool ever reaches the press
Team leaders → line-down alerts with the fix, in seconds not minutes
Quality → pulled to the line the instant right-first-time slips, 8D pre-drafted
Stores & planning → works orders raised and scheduled before stock runs out
Everyone → the right instruction, the right person, the right moment — automatically